2D Information available at all stages of the project is modeled to 3D Model to extract all the relevant information graphically throughout its life cycle.
CLASH DETECTION
A method to detect inter disciplinary clashes and avoid last minute surprises at site.
4D BUILDING CONSTRUCTION SEQUENCING/SCHEDULING
4D adds the time factor to the construction schedule in the 3D model. We candirectly link each activity of a gantt chart (generated in the project management software such as Primavera or Microsoft project) to the BIM.
These animated models represent the planned construction sequence set against time. The main purpose of a construction phasing simulation is to provide a tool that will help the construction team to visualize logistical issues and inefficiencies.
5D SIMULATIONS
To arrive the accurate quantities or verify the quantities provided by the end client for bidding or execution.
6D FACILITY MANAGEMENT
Using 6D BIM, the traditional methods of documentation, maintenance, control can be changed for FM. The components belonging to all disciplines viz mechanical, electrical, plumbing,and fire protection in a building gets monitored by 6D BIM FM, acquiring the data of the each component in different timely manners.
ENERGY MODELING
We use energy modeling to predict sources of potential energy loss or savings in aproposed building design which ensure adequacy of daylight and energy usage.
POINT CLOUD TO BIM
Scan to BIM is the method to retrieve the building data in Revit, enabling to create and validate a model with automated recognition and placement of architectural elements such as walls and columns, as well as MEP elements such as pipes, ducts, conduits and more.